Delivering a promise of

Quality- Safety- Satisfaction

Our vast experience and R&D efforts have enabled us to develop technically superior and cost effective products which have laid the foundation of successful projects for our customers. We have supplied a vivid range of FRP products for the completion of various projects both on domestic and international front. Our all product manufacturing processes are guided by the principles of quality and customer satisfaction above all.

Our Projects

Railways & Metro Projects

Alstom - Mumbai Metro

Year of start: 2020-21
Number of Train Sets: 31

HIGHLIGHTS
Design and development done at MSL India. Successfully supplied


Indian Railways- LHB coach interiors

Types of Coaches First Class AC/ AC 2 Tier/ AC 3 Tier/ 3 Tier Sleeper/ Chair Car

Products Supplied

  • Interior paneling for Driver Cabs
  • Interior paneling for LHB Passenger Coaches
  • Interior paneling for MEMU/MRVC/IGBT/DMU/DPC Coaches
  • Locomotive parts
  • Trough below AC cover

Manufacturing Process
Hand Lay-up

Finish Requirement
Gel coated finish with Gloss more than 60

Mechanical properties + FST
Standard MDTS – 133 & MDTS- 214


Indian Railways- Vande Bharat

Manufactured Parts
Nose Cone
Modular Toilet
Interior panelling
Furnishing of full coach interior

FST Standard
EN 45545-2 HL-2

Execution
Successfully supplied


Alstom – Pune Metro

Year of Start-2020-2025
Number of Train Sets – 22

HIGHLIGHTS
Design and development done in MSL India.
Successfully supplied.


Alstom - Tren Maya Mexico - Long Distance Train Awarded in 2023

Products Supplied

  • Front Mask & Exterior Components.
  • Driver Desk & Cab Interiors.
  • Door Pillars & Coach Interiors.

Manufacturing Process –
Contact Moulding

Finish Requirement -
Painted with High Gloss more than 90%

Fire Standard -
EN 45545-2 HL-2
42 Train sets successfully supplied.


Bombardier - TALENT II

Executed through Stratiforme France JV partner Front Mask, Spoiler, Exterior Paneling. Successfully supplied.


Bombardier - REGIO 2N

Executed through Stratiforme France JV Partner Front Mask, Exterior and Interior Paneling. Successfully supplied.


Alstom - Chennai Metro
( Awarded in 2011 )

Products Supplied

  • Front mask scope
  • Exterior garnishing components
  • Driver desk
  • Cab fitting garnishing components

Manufacturing Process
Hand Lay-up

Finish Requirement
Painted with Gloss level more than 90

FST Standard
NFF 16101 (French Standard)

Execution
Design and development done at Stratiforme France.
After delivery of 1st 9 TS by Stratiforme to Alstom Brazil, the balance was made at MSL for Alstom India.


Alstom - Sydney Metro
(Awarded in 2016)

Products Supplied

  • Front mask scope
  • Exterior garnishing components
  • Driver desk
  • Cab fitting garnishing components

Manufacturing Process
Hand Lay-up

Finish Requirement
Painted with Gloss level more than 90

FST Standard
EN 45545-2 HL-2

Execution
Successfully supplied both orders.
Design and development done at MSL India.


Alstom -Lucknow Metro
(Awarded in 2016)

Products Supplied

  • Coach interior Side wall
  • Gang ways
  • Cab partition

Manufacturing Process
Light Resin Transfer Molding (LRTM)

Finish Requirement
Gel coated finish with Gloss more than 60 with Scratch resistance

FST Standard
NFF 16101 ( French Standard )

Execution
Design and development done at MSL India.
Successfully supplied.


Wabtec Corporation ( Formely GE Transportation )

Types of Coaches

FRP parts for Locomotives.

Products Supplied

  • Toilet Enclosure with Door
  • Vestibule Doors
  • Battery Covers
  • Insulation Tie Rings
  • Sink
  • Tie Baffle
  • Shroud
  • Driver Console

Manufacturing Process
RTM / Filament Winding / Compression molding / Hand Lay up.

Finish Requirement
Painted & Gel coated finish


CAF: Passenger Seats

Year of Start - 2025
Delivery Location - TRADINSA, Spain
Number of Seats (4S/3S) - 117 Nos

Project Highlights

  • Development done at MSL India
  • Successfully supplied.

CAF: Interior Window Lining

Year of Start - 2025
Delivery Location - USA
Number of Coach set - 4 Sets

Project Highlights

  • Development done at MSL India
  • Successfully supplied.

Automotive Projects

SML Isuzu Limited (SMLI):
School Bus and Staff Bus

Year of Start - 2025
Production - 1000-2000 Bus
Sets Annually

Products Manufactured

  • Front and Rear Fascia
  • Front and Rear Inner Dome
  • Wheel Cover

SML Maxi Cab

Year of Start - 2025
Production - 100-500 Bus Sets Annually

Products Manufactured

  • Front and Rear Fascia
  • Front and Rear Inner Dome

Tata Motors through JCBL:
School Bus and Staff Bus

Year of Start - 2025
Production - 500-1000 Bus Sets Annually

Products Manufactured

  • Front and Rear Fascia
  • Front and Rear Inner Dome
  • Wheel Cover
  • Dashboard and Bonnet

JCBL Limited: Buses

Year of Start - 2000
Production - 2000-3000 Bus Sets Annually

Products Manufactured

  • Front and Rear Fascia
  • Front and Rear Inner Dome
  • Wheel Cover
  • Dashboard and Bonnet

Defence & Aerospace Projects

Unmanned Aerial Vehicle (UAV)/Drone body parts and structures

Year of Start - 2025

Material Composition
Glass and carbon Composites in Wet layup and Prepregs.

Manufacturing Process
Resin Infusion and Vacuum Bagging.

Architecture, Building & Construction (ABC) Projects

Building Facade, Claddings & Architectural Mouldings

Year of Start - 2025

Material Composition
Glass reinforced concreate (GRC) & Glass Reinforced plastic (GRP).

Manufacturing Process
Spay-up & moulding.